Browse Items (4 total)

  • Temporal Coverage is exactly "1944-01-20"

BWarnerJWarnerJv1.pdf
First operation to Montluçon 15 September 1943. Briefed as easy trip with little opposition. Arrived early and waited for pathfinders, bombed from 8000 ft. Wing Commander Smith missing from operation reported hit by bombs. Operation 2, Mondane 16…

SChattertonJ159568v10291.jpg
Indicated two bomb loads for operation. Includes preselection and false height settings as well as Window, route and route marking. On the reverse target marking, bombing instructions and spoof attack

SChattertonJ159568v10280.jpg
Signal from 5 Group to all 5 Group Stations stating standby for operations on 20 January. Details A and B bomb loads with preselection settings. On the reverse 'Bombing Leader from Int'.

SChattertonJ159568v10279.jpg
Lists crews and aircraft for operations on night 20/21 January 1944. The fourth member in each crew is underlined in blue and ticked. Includes duty personnel, standby crew and timings.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2