Process check on screwed work to inspection instruction A.9

SNolanJF150621v10026.jpg

Title

Process check on screwed work to inspection instruction A.9

Description

Comments on inspection when little screwed work done.

Creator

Date

1943-03-25

Temporal Coverage

Coverage

Language

Type

Format

One page typewritten document

Rights

This content is available under a CC BY-NC 4.0 International license (Creative Commons Attribution-NonCommercial 4.0). It has been published ‘as is’ and may contain inaccuracies or culturally inappropriate references that do not necessarily reflect the official policy or position of the University of Lincoln or the International Bomber Command Centre. For more information, visit https://creativecommons.org/licenses/by-nc/4.0/ and https://ibccdigitalarchive.lincoln.ac.uk/omeka/legal.

Contributor

Identifier

SNolanJF150621v10026

Transcription

[Underlined] Process Check on Screwed Work to Inspection Instruction A.9. [/underlined]

[Underlined] ‘B’ Shop Group. [/underlined]
[Underlined] 25/3/43. [/underlined]

Very little screwed work is at present being done, as all gauges have been returned to the Coventry Tool Co. for re-grinding and re-adjustment.
Whilst the gauges are away, any small urgent order for screwed work is being taken to other shops for inspection.
Since the previous month’s check, the system of re-screwing salvage bolts has been stopped.
The only screwed work available for checking was:-

3/8” B.S.F. H.T. Steel Bolts for U/C 5284/B11.

The Wickman Caliper gauge was borrowed from H2 Shop, and all were found satisfactory to gauge and drawings.

J F Nolan