Nolan, Frank. Work folder
Description
An account of the resource
Twenty eight items. Folder containing work related correspondence and ministry of aircraft manufacture, aeronautical inspection directorate process reports.
Date
A point or period of time associated with an event in the lifecycle of the resource
2016-05-17
Publisher
An entity responsible for making the resource available
IBCC Digital Archive
Rights
Information about rights held in and over the resource
This content is available under a CC BY-NC 4.0 International license (Creative Commons Attribution-NonCommercial 4.0). It has been published ‘as is’ and may contain inaccuracies or culturally inappropriate references that do not necessarily reflect the official policy or position of the University of Lincoln or the International Bomber Command Centre. For more information, visit https://creativecommons.org/licenses/by-nc/4.0/ and https://ibccdigitalarchive.lincoln.ac.uk/omeka/legal.
Identifier
An unambiguous reference to the resource within a given context
Nolan, JF
Transcribed document
A resource consisting primarily of words for reading.
Transcription
Text transcribed from audio recording or document
[Underlined] Process Check on Screwed Work to Inspection Instruction A.9. [/underlined]
[Underlined] ‘B’ Shop Group. [/underlined]
[Underlined] 25/3/43. [/underlined]
Very little screwed work is at present being done, as all gauges have been returned to the Coventry Tool Co. for re-grinding and re-adjustment.
Whilst the gauges are away, any small urgent order for screwed work is being taken to other shops for inspection.
Since the previous month’s check, the system of re-screwing salvage bolts has been stopped.
The only screwed work available for checking was:-
3/8” B.S.F. H.T. Steel Bolts for U/C 5284/B11.
The Wickman Caliper gauge was borrowed from H2 Shop, and all were found satisfactory to gauge and drawings.
J F Nolan
Dublin Core
The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.
Title
A name given to the resource
Process check on screwed work to inspection instruction A.9
Description
An account of the resource
Comments on inspection when little screwed work done.
Creator
An entity primarily responsible for making the resource
J F Nolan
Date
A point or period of time associated with an event in the lifecycle of the resource
1943-03-25
Format
The file format, physical medium, or dimensions of the resource
One page typewritten document
Language
A language of the resource
eng
Type
The nature or genre of the resource
Text
Identifier
An unambiguous reference to the resource within a given context
SNolanJF150621v10026
Coverage
The spatial or temporal topic of the resource, the spatial applicability of the resource, or the jurisdiction under which the resource is relevant
Civilian
Temporal Coverage
Temporal characteristics of the resource.
1943-03-25
Publisher
An entity responsible for making the resource available
IBCC Digital Archive
Rights
Information about rights held in and over the resource
This content is available under a CC BY-NC 4.0 International license (Creative Commons Attribution-NonCommercial 4.0). It has been published ‘as is’ and may contain inaccuracies or culturally inappropriate references that do not necessarily reflect the official policy or position of the University of Lincoln or the International Bomber Command Centre. For more information, visit https://creativecommons.org/licenses/by-nc/4.0/ and https://ibccdigitalarchive.lincoln.ac.uk/omeka/legal.
Contributor
An entity responsible for making contributions to the resource
Anne-Marie Watson