Process check on riveting to instruction A.24 and M.426

SNolanJF150621v10031.jpg

Title

Process check on riveting to instruction A.24 and M.426

Description

No changes to report and mentions checks done.

Creator

Date

1944-02-11

Temporal Coverage

Coverage

Language

Type

Format

One page typewritten document

Rights

This content is available under a CC BY-NC 4.0 International license (Creative Commons Attribution-NonCommercial 4.0). It has been published ‘as is’ and may contain inaccuracies or culturally inappropriate references that do not necessarily reflect the official policy or position of the University of Lincoln or the International Bomber Command Centre. For more information, visit https://creativecommons.org/licenses/by-nc/4.0/ and https://ibccdigitalarchive.lincoln.ac.uk/omeka/legal.

Contributor

Identifier

SNolanJF150621v10031

Transcription

[Underlined] PROCESS CHECK ON RIVETING TO INSPECTION INSTRUCTIONS A.24 AND M.426. [/underlined]

[Underlined] B SHOP GROUP. 11/2/44. [/underlined]

There are no changes to report on riveting processes since the last check dated 18/11/43.

Storage records were checked and found to be in order.

The book temperatures of Drikold containers was found to have no entry since 19/12/43. The W.I.D. Senior Inspector agreed to having the check taken regularly every two weeks.

There is a slight improvement in the standard of workmanship, but strict supervision is being maintained by A.I.D. and W.I.D.

Process as viewed is considered satisfactory.

J. F. Nolan

Citation

J F Nolan, “Process check on riveting to instruction A.24 and M.426,” IBCC Digital Archive, accessed July 22, 2024, https://ibccdigitalarchive.lincoln.ac.uk/omeka/collections/document/29003.

Item Relations

This item has no relations.