Process check on other protective treatments to specification D.T.D 209A
Title
Process check on other protective treatments to specification D.T.D 209A
Description
Covers cleaning, drying, components and remarks.
Creator
Date
1943-08-24
Temporal Coverage
Coverage
Language
Type
Format
One page typewritten document
Publisher
Rights
This content is available under a CC BY-NC 4.0 International license (Creative Commons Attribution-NonCommercial 4.0). It has been published ‘as is’ and may contain inaccuracies or culturally inappropriate references that do not necessarily reflect the official policy or position of the University of Lincoln or the International Bomber Command Centre. For more information, visit https://creativecommons.org/licenses/by-nc/4.0/ and https://ibccdigitalarchive.lincoln.ac.uk/omeka/legal.
Contributor
Identifier
SNolanJF150621v10028
Transcription
Process Check on Other Protective Treatments to Specification D.T.D. [deleted] 209A. [/deleted] [inserted] 209.A. [/inserted]
B and BE Shops.
24th August, 1943.
[Underlined] Cleaning [/underlined] Is satisfactorily carried out on all details, assemblies, and components with turpentine substitute or thinners.
[Underlined] Drying [/underlined] There are now very few small details passing through the paint shop, and therefore drying racks are not in use.
[Underlined] Components. [/underlined] Markings are well carried out to A.V. Roe’s approved drawings. Aileron structures are stripped and a coat of dope resisting paint to Specification 3X4 is applied prior to fabric covering.
[Underlined] Remarks. [/underlined] A number of batch numbers, taken from paint drums now in use were satisfactorily traced back to their respective release notes. A good standard of workmanship is being maintained generally, and parts examined were found to be free from flaking and to have a good even finish.
J F Nolan
B and BE Shops.
24th August, 1943.
[Underlined] Cleaning [/underlined] Is satisfactorily carried out on all details, assemblies, and components with turpentine substitute or thinners.
[Underlined] Drying [/underlined] There are now very few small details passing through the paint shop, and therefore drying racks are not in use.
[Underlined] Components. [/underlined] Markings are well carried out to A.V. Roe’s approved drawings. Aileron structures are stripped and a coat of dope resisting paint to Specification 3X4 is applied prior to fabric covering.
[Underlined] Remarks. [/underlined] A number of batch numbers, taken from paint drums now in use were satisfactorily traced back to their respective release notes. A good standard of workmanship is being maintained generally, and parts examined were found to be free from flaking and to have a good even finish.
J F Nolan
Collection
Citation
J F Nolan, “Process check on other protective treatments to specification D.T.D 209A,” IBCC Digital Archive, accessed December 3, 2024, https://ibccdigitalarchive.lincoln.ac.uk/omeka/collections/document/29001.
Item Relations
This item has no relations.