Bombing instruction signal
Title
Bombing instruction signal
Description
Signal to all 5 Group Stations instructing bomb aimers to that the 32 point distributor setting is to be 0.25 seconds until further notice.
Creator
Date
1944-03-30
Temporal Coverage
Language
Format
One page doucment
Publisher
Rights
This content is available under a CC BY-NC 4.0 International license (Creative Commons Attribution-NonCommercial 4.0). It has been published ‘as is’ and may contain inaccuracies or culturally inappropriate references that do not necessarily reflect the official policy or position of the University of Lincoln or the International Bomber Command Centre. For more information, visit https://creativecommons.org/licenses/by-nc/4.0/ and https://ibccdigitalarchive.lincoln.ac.uk/omeka/legal.
Contributor
Identifier
SChattertonJ159568v10005
Transcription
Bomb /Ldn 22
STAND BY FOR OPS B/CAST
V GPE O-P
FROM HQ NO 5 GROUP 301130A
TO ALL 5 GROUP STATIONS
SECRET QQX BT
A0182 30/3/44 AIR STAFF SIGNAL
REFERENCE A.S.I OPS 1/16 THE 32 POINT DISTRIBUTOR SETTING IS TO BE AMENDED TO READ .25 SECONDS UNTIL FURTHER NOTICE.
BOMBING LEADERS ARE TO [DELETED] CXXX [/DELETED] CALCULATE THE NECESSARY DELAY FOR 4LB INCENDIARIES RELEASE SO THAT THE 4LB STICK WILL STRADDLE THAT OF THE 30LB AND HE (sic) STICK.
THE PEG IS TO BE USED ON THE [DELETED] I [/DELETED] DISTRIBUTOR TO EFFECT THE DELAY.
CREWS MUST BE BRIEFED CAREFULLY TO ENSURE THAT THERE IS NO CREEP – BACK OF 4LB INCENDIARIES.
ACKNOWLEDGE BY TELEPRINTER
BT 301130A
[DELETED] AC WA NEXCESSARY (sic) DELAY [/DELETED]
PC AR+
DLG. R.1154 / 30. DB
INT
DATE 30/3/44
INITIALS D.B
STAND BY FOR OPS B/CAST
V GPE O-P
FROM HQ NO 5 GROUP 301130A
TO ALL 5 GROUP STATIONS
SECRET QQX BT
A0182 30/3/44 AIR STAFF SIGNAL
REFERENCE A.S.I OPS 1/16 THE 32 POINT DISTRIBUTOR SETTING IS TO BE AMENDED TO READ .25 SECONDS UNTIL FURTHER NOTICE.
BOMBING LEADERS ARE TO [DELETED] CXXX [/DELETED] CALCULATE THE NECESSARY DELAY FOR 4LB INCENDIARIES RELEASE SO THAT THE 4LB STICK WILL STRADDLE THAT OF THE 30LB AND HE (sic) STICK.
THE PEG IS TO BE USED ON THE [DELETED] I [/DELETED] DISTRIBUTOR TO EFFECT THE DELAY.
CREWS MUST BE BRIEFED CAREFULLY TO ENSURE THAT THERE IS NO CREEP – BACK OF 4LB INCENDIARIES.
ACKNOWLEDGE BY TELEPRINTER
BT 301130A
[DELETED] AC WA NEXCESSARY (sic) DELAY [/DELETED]
PC AR+
DLG. R.1154 / 30. DB
INT
DATE 30/3/44
INITIALS D.B
Citation
Great Britain. Royal Air Force, “Bombing instruction signal,” IBCC Digital Archive, accessed December 4, 2024, https://ibccdigitalarchive.lincoln.ac.uk/omeka/collections/document/7082.
Item Relations
This item has no relations.