Handwritten note
Title
Handwritten note
Description
Mentions spot check on No 4 tank. Process satisfactory.
Coverage
Language
Type
Format
One page handwritten note
Publisher
Rights
This content is available under a CC BY-NC 4.0 International license (Creative Commons Attribution-NonCommercial 4.0). It has been published ‘as is’ and may contain inaccuracies or culturally inappropriate references that do not necessarily reflect the official policy or position of the University of Lincoln or the International Bomber Command Centre. For more information, visit https://creativecommons.org/licenses/by-nc/4.0/ and https://ibccdigitalarchive.lincoln.ac.uk/omeka/legal.
Contributor
Identifier
SNolanJF150621v10035
Transcription
A spot check was taken on No 4 tank; it was found to contain 1” water which is well within a safe limit as the draw pipe is placed 5” from the bottom of the tank.
Process is considered satisfactory.
[Underlined] Eng. Oil [/underlined] – Winter. DTD. 472 A/O
Summer. DTD. 472 B/O
[Underlined] Hyd Oil. [/underlined] old – DTD. 44D
New – DTD. 585.
Process is considered satisfactory.
[Underlined] Eng. Oil [/underlined] – Winter. DTD. 472 A/O
Summer. DTD. 472 B/O
[Underlined] Hyd Oil. [/underlined] old – DTD. 44D
New – DTD. 585.
Collection
Citation
“Handwritten note,” IBCC Digital Archive, accessed May 1, 2024, https://ibccdigitalarchive.lincoln.ac.uk/omeka/collections/document/29005.
Item Relations
This item has no relations.