Browse Items (33 total)

  • Tags: bombing of the Boulogne E-boats (15/16 June 1944)

MCheshireGL72021-181210-030008.jpg
Describes planned timing to attack at the same time as the main force. Reports that weather was unfavourable. After initially cancelling the operation leader checked out weather at low level but decided low visibility and target defences precluded…

MCheshireGL72021-181210-030002.jpg
States date 15/16 June 1944, target, zero hour 2235. Shows Wing Commander Cheshire leader and marker in Mosquito and 22 crews flying Lancaster all armed with Tallboy bombs.

MCheshireGL72021-181210-030001.jpg
Buff file cover lists contents: No photos - all failures, Photographic Reconnaissance Unit, interpretation report. crew list.

MCheshireGL72021-181210-020002.jpg
Message is a copy of Headquarters Bomber Command signal congratulating crews that their attacks on Le Havre and Boulogne succeeded in virtually destroying German naval assets in those harbours.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2