Browse Items (4 total)

  • Temporal Coverage is exactly "1944-05-01"

MCheshireGL72021-181210-090002.jpg
Provides results of attacks on Mailly le Camp military depot and tank park 3/4 May, Clerment-Ferrand aircraft factory 29/30 April, Toulouse aircraft assembly works and Montaudran airfield 5/6 April and 1/2 May, Lyon Motor vehicle works 1/2 May,…

SChattertonJ159568v10692.jpg
Table with tare, petrol, bomb and all up weight for six configurations although the last on right is struck through.

SChattertonJ159568v10086.jpg
Lists crews and aircraft for operations 1/2 May 1944. Includes duty personnel. Annotated with heights for each aircraft and handwritten notes. One member of each crew underlined in red. On the reverse handwritten calculations.

SChattertonJ159568v10084.jpg
Shows four bomb loads for the squadron. Includes preselection settings, Window, route and method. Mentions that Moisquito will search for and mark target. Annotated 'Toulouse'. On the reverse target marking and bombing notes.
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2