The dam nearing completion
Title
The dam nearing completion
Description
The breach repaired. The wall built up to the top. Cranes still in place for recovering contruction materials. Three barrage balloons visible.
Date
1943
Temporal Coverage
Coverage
Format
One b/w photograph and one drawing
Is Part Of
Publisher
Rights
This content was licensed to the IBCC Digital Archive for publication by Dr Lena Lewald of the Möhnesee Archive who has kindly granted the International Bomber Command Centre Digital Archive a royalty-free permission to publish it. Please note that it was digitised by a third-party which used technical specifications that may differ from those used by International Bomber Command Centre Digital Archive. It has been published here ‘as is’ and may contain inaccuracies or culturally inappropriate references that do not necessarily reflect the official policy or position of the University of Lincoln or the International Bomber Command Centre.
Identifier
PMoehneseeArch26060002, PMoehneseeArch26060003
Collection
Citation
“The dam nearing completion,” IBCC Digital Archive, accessed November 10, 2026, https://ibccdigitalarchive.lincoln.ac.uk/collections/document/62609.

